Buildings Fast Navigation
Basics (+)
|
Short production (+)
|
Long production (+)
|
Others (+)
|
|
Quarry
|
|
Town Hall level:
|
2
|
Max. units:
|
1
|
Grid measurements
|
Width:
|
6 sq
|
Height:
|
8 sq
|
The Quarry is a small production building that requires Fish and produces Stone .
Upgrading
Levels 1-10 U
#
|
TH Level
|
Time
|
|
|
Cost
|
|
OR
|
1
|
2
|
5m
|
150
|
50
|
300
|
|
50
|
2
|
2
|
8m
|
200
|
80
|
500
|
700
|
60
|
3
|
2
|
15m
|
250
|
110
|
700
|
1,000
|
70
|
4
|
3
|
30m
|
300
|
140
|
1,000
|
1,200
|
80
|
5
|
3
|
1h
|
400
|
180
|
2,000
|
1,400
|
90
|
6
|
3
|
2h
|
500
|
220
|
3,500
|
1,700
|
100
|
7
|
4
|
6h
|
700
|
300
|
4,500
|
2,000
|
110
|
8
|
4
|
8h
|
800
|
6,500
|
3,000
|
150
|
120
|
9
|
4
|
10h 10m
|
900
|
9,000
|
4,500
|
200
|
130
|
10
|
4
|
12h
|
1,000
|
15,000
|
6,000
|
300
|
150
|
Levels 11-20 U
#
|
TH Level
|
Time
|
|
|
Cost
|
|
OR
|
11
|
5
|
13h
|
1,200
|
20,000
|
8,000
|
400
|
170
|
12
|
6
|
14h
|
1,400
|
30,000
|
13,000
|
700
|
190
|
13
|
7
|
15h
|
2,000
|
45,000
|
16,000
|
1,000
|
210
|
14
|
8
|
16h
|
2,300
|
50,000
|
20,000
|
1,500
|
230
|
15
|
8
|
17h
|
2,600
|
60,000
|
28,000
|
2,000
|
250
|
16
|
9
|
18h
|
3,000
|
90,000
|
36,000
|
2,500
|
270
|
17
|
10
|
19h
|
3,600
|
130,000
|
44,000
|
3,000
|
290
|
18
|
11
|
20h
|
4,200
|
170,000
|
6,000
|
8
|
310
|
19
|
12
|
21h
|
6,000
|
220,000
|
12,000
|
9
|
310
|
20
|
13
|
1d
|
10,000
|
280,000
|
16,000
|
11
|
310
|
Levels 21-30 U
#
|
TH Level
|
Time
|
|
|
Cost
|
|
OR
|
21
|
14
|
1d 1h
|
14,000
|
340,000
|
20,000
|
12
|
310
|
22
|
15
|
1d 2h
|
20,000
|
400,000
|
25,000
|
13
|
310
|
23
|
16
|
1d 3h
|
28,000
|
470,000
|
30,000
|
15
|
310
|
24
|
17
|
1d 5h
|
38,000
|
540,000
|
36,000
|
17
|
310
|
25
|
18
|
1d 7h
|
50,000
|
610,000
|
42,000
|
18
|
310
|
26
|
19
|
1d 9h
|
64,000
|
700,000
|
49,000
|
20
|
310
|
27
|
20
|
1d 11h
|
80,000
|
800,000
|
57,000
|
22
|
310
|
28
|
21
|
1d 13h
|
98,000
|
900,000
|
65,000
|
25
|
310
|
29
|
22
|
1d 15h
|
119,000
|
1,000,000
|
74,000
|
27
|
310
|
30
|
23
|
1d 17h
|
143,000
|
1,100,000
|
84,000
|
30
|
310
|
Levels 31-40 U
#
|
TH Level
|
Time
|
|
|
Cost
|
|
OR
|
31
|
24
|
1d 19h
|
168,000
|
1,200,000
|
95,000
|
32
|
310
|
32
|
25
|
1d 21h
|
193,000
|
1,300,000
|
110,000
|
35
|
310
|
33
|
26
|
1d 23h
|
225,000
|
1,400,000
|
125,000
|
38
|
310
|
34
|
27
|
2d 1h
|
260,000
|
1,520,000
|
145,000
|
41
|
310
|
35
|
28
|
2d 3h
|
300,000
|
1,660,000
|
165,000
|
45
|
310
|
36
|
29
|
2d 5h
|
350,000
|
1,820,000
|
190,000
|
48
|
310
|
37
|
30
|
2d 7h
|
400,000
|
2,000,000
|
220,000
|
52
|
310
|
38
|
31
|
2d 9h
|
450,000
|
2,200,000
|
255,000
|
56
|
310
|
39
|
32
|
2d 11h
|
510,000
|
2,420,000
|
295,000
|
60
|
310
|
40
|
33
|
2d 13h
|
580,000
|
2,670,000
|
340,000
|
64
|
310
|
Levels 41-50 U
#
|
TH Level
|
Time
|
|
|
Cost
|
|
OR
|
41
|
34
|
2d 14h
|
660,000
|
2,928,000
|
390,000
|
69
|
310
|
42
|
35
|
2d 16h
|
750,000
|
3,208,000
|
445,000
|
73
|
310
|
43
|
36
|
2d 17h
|
850,000
|
3,518,000
|
505,000
|
78
|
310
|
44
|
37
|
2d 18h
|
960,000
|
3,858,000
|
570,000
|
83
|
310
|
45
|
38
|
2d 19h
|
1,100,000
|
4,218,000
|
640,000
|
89
|
310
|
46
|
39
|
2d 21h
|
1,260,000
|
4,600,000
|
715,000
|
94
|
310
|
47
|
40
|
2d 23h
|
1,440,000
|
4,990,000
|
795,000
|
100
|
310
|
48
|
41
|
3d 1h
|
1,640,000
|
5,390,000
|
880,000
|
106
|
310
|
49
|
42
|
3d 2h
|
1,860,000
|
5,800,000
|
970,000
|
112
|
310
|
50
|
43
|
3d 3h
|
2,100,000
|
6,300,000
|
1,080,000
|
119
|
310
|
Levels 51-60 U
#
|
TH Level
|
Time
|
|
|
Cost
|
|
OR
|
51
|
44
|
3d 5h
|
2,360,000
|
6,890,000
|
1,215,000
|
126
|
310
|
52
|
45
|
3d 7h
|
2,640,000
|
7,580,000
|
1,380,000
|
133
|
310
|
53
|
46
|
3d 8h
|
2,940,000
|
8,370,000
|
1,580,000
|
140
|
310
|
54
|
47
|
3d 10h
|
3,260,000
|
9,260,000
|
1,820,000
|
148
|
310
|
55
|
48
|
3d 12h
|
3,600,000
|
10,250,000
|
2,105,000
|
155
|
310
|
56
|
49
|
3d 14h
|
3,960,000
|
11,340,000
|
2,440,000
|
163
|
310
|
57
|
50
|
3d 15h
|
4,340,000
|
12,530,000
|
2,830,000
|
172
|
310
|
58
|
51
|
3d 17h
|
4,740,000
|
13,820,000
|
3,280,000
|
180
|
310
|
59
|
52
|
3d 19h
|
5,160,000
|
14,509,000
|
3,360,000
|
189
|
310
|
60
|
53
|
3d 21h
|
5,600,000
|
15,222,000
|
3,526,000
|
199
|
310
|
Levels 61-70 U
#
|
TH Level
|
Time
|
|
|
Cost
|
|
OR
|
61
|
54
|
3d 23h
|
6,060,000
|
15,954,000
|
3,695,000
|
208
|
310
|
62
|
55
|
4d 1h
|
6,540,000
|
16,703,000
|
3,868,000
|
218
|
310
|
63
|
56
|
4d 3h
|
7,040,000
|
17,470,000
|
4,046,000
|
228
|
310
|
64
|
57
|
4d 5h
|
7,560,000
|
18,254,000
|
4,228,000
|
239
|
310
|
65
|
58
|
4d 7h
|
8,100,000
|
19,057,000
|
4,413,000
|
249
|
310
|
66
|
59
|
4d 9h
|
8,660,000
|
19,876,000
|
4,603,000
|
260
|
310
|
67
|
60
|
4d 11h
|
9,240,000
|
20,714,000
|
4,797,000
|
272
|
310
|
68
|
61
|
4d 13h
|
9,840,000
|
21,569,000
|
4,995,000
|
284
|
310
|
69
|
62
|
4d 15h
|
10,460,000
|
22,442,000
|
5,198,000
|
296
|
310
|
70
|
63
|
4d 17h
|
11,100,000
|
23,333,000
|
5,404,000
|
308
|
310
|
Levels 71-80 U
#
|
TH Level
|
Time
|
|
|
Cost
|
|
OR
|
71
|
64
|
4d 19h
|
11,760,000
|
24,242,000
|
5,614,000
|
321
|
310
|
72
|
65
|
4d 21h
|
12,440,000
|
25,168,000
|
5,829,000
|
334
|
310
|
73
|
66
|
4d 23h
|
13,140,000
|
26,111,000
|
6,047,000
|
347
|
310
|
74
|
67
|
5d 1h
|
13,860,000
|
27,073,000
|
6,270,000
|
361
|
310
|
75
|
68
|
5d 3h
|
14,600,000
|
28,052,000
|
6,497,000
|
375
|
310
|
76
|
69
|
5d 5h
|
15,360,000
|
29,049,000
|
6,728,000
|
390
|
310
|
Production
Efficiency units:
- Stone per minute (/min). How quickly does the Quarry produce stone?
- Stone per fish (/). How cost-efficient is the Quarry? How much do I get for 1 ?
Levels 1-10
Level
|
Production
|
|
Efficiency
|
Time
|
Cost
|
Prod
|
/ h
|
/h
|
/ min
|
/
|
1
|
5m
|
100
|
10
|
1,200
|
120
|
2
|
0.1
|
2
|
7m 30s
|
250
|
28
|
2,000
|
224
|
4
|
0.11
|
3
|
10m
|
450
|
68
|
2,700
|
408
|
7
|
0.15
|
4
|
12m 30s
|
800
|
92
|
3,840
|
442
|
7
|
0.12
|
5
|
15m
|
1,000
|
120
|
4,000
|
480
|
8
|
0.12
|
6
|
17m 30s
|
1,200
|
150
|
4,114
|
514
|
9
|
0.13
|
7
|
20m
|
1,400
|
180
|
4,200
|
540
|
9
|
0.13
|
8
|
22m 30s
|
1,600
|
215
|
4,267
|
573
|
10
|
0.13
|
9
|
25m
|
1,800
|
265
|
4,320
|
636
|
11
|
0.15
|
10
|
27m 30s
|
2,300
|
325
|
5,018
|
709
|
12
|
0.14
|
Levels 11-20
Level
|
Production
|
|
Efficiency
|
Time
|
Cost
|
Prod
|
/ h
|
/h
|
/ min
|
/
|
11
|
30m
|
2,600
|
400
|
5,200
|
800
|
13
|
0.15
|
12
|
32m 30s
|
3,000
|
480
|
5,538
|
886
|
15
|
0.16
|
13
|
35m
|
3,500
|
570
|
6,000
|
977
|
16
|
0.16
|
14
|
37m 30s
|
4,000
|
660
|
6,400
|
1,056
|
18
|
0.17
|
15
|
40m
|
4,600
|
780
|
6,900
|
1,170
|
20
|
0.17
|
16
|
42m 30s
|
5,000
|
890
|
7,059
|
1,256
|
21
|
0.18
|
17
|
45m
|
5,500
|
1,060
|
7,333
|
1,413
|
24
|
0.19
|
18
|
47m 30s
|
6,000
|
1,220
|
7,579
|
1,541
|
26
|
0.2
|
19
|
50m
|
6,500
|
1,380
|
7,800
|
1,656
|
28
|
0.21
|
20
|
|
7,000
|
1,540
|
8,400
|
1,848
|
31
|
0.22
|
Levels 21-30
Level
|
Production
|
|
Efficiency
|
Time
|
Cost
|
Prod
|
/ h
|
/h
|
/ min
|
/
|
21
|
50m
|
7,500
|
1,700
|
9,000
|
2,040
|
34
|
0.23
|
22
|
|
8,100
|
1,950
|
9,720
|
2,340
|
39
|
0.24
|
23
|
|
8,700
|
2,200
|
10,440
|
2,640
|
44
|
0.25
|
24
|
|
9,300
|
2,450
|
11,160
|
2,940
|
49
|
0.26
|
25
|
|
9,900
|
2,700
|
11,880
|
3,240
|
54
|
0.27
|
26
|
|
10,500
|
2,960
|
12,600
|
3,552
|
59
|
0.28
|
27
|
|
11,200
|
3,300
|
13,440
|
3,960
|
66
|
0.29
|
28
|
|
11,900
|
3,650
|
14,280
|
4,380
|
73
|
0.31
|
29
|
|
12,600
|
4,000
|
15,120
|
4,800
|
80
|
0.32
|
30
|
|
13,300
|
4,350
|
15,960
|
5,220
|
87
|
0.33
|
Levels 31-40
Level
|
Production
|
|
Efficiency
|
Time
|
Cost
|
Prod
|
/ h
|
/h
|
/ min
|
/
|
31
|
50m
|
14,000
|
4,700
|
16,800
|
5,640
|
94
|
0.34
|
32
|
|
14,800
|
5,150
|
17,760
|
6,180
|
103
|
0.35
|
33
|
|
15,600
|
5,600
|
18,720
|
6,720
|
112
|
0.36
|
34
|
|
16,400
|
6,050
|
19,680
|
7,260
|
121
|
0.37
|
35
|
|
17,200
|
6,500
|
20,640
|
7,800
|
130
|
0.38
|
36
|
|
18,000
|
6,950
|
21,600
|
8,340
|
139
|
0.39
|
37
|
|
18,900
|
7,500
|
22,680
|
9,000
|
150
|
0.4
|
38
|
|
19,800
|
8,050
|
23,760
|
9,660
|
161
|
0.41
|
39
|
|
20,700
|
8,600
|
24,840
|
10,320
|
172
|
0.42
|
40
|
|
21,600
|
9,150
|
25,920
|
10,980
|
183
|
0.42
|
Levels 41-50
Level
|
Production
|
|
Efficiency
|
Time
|
Cost
|
Prod
|
/ h
|
/h
|
/ min
|
/
|
41
|
50m
|
22,500
|
9,700
|
27,000
|
11,640
|
194
|
0.43
|
42
|
|
23,500
|
10,350
|
28,200
|
12,420
|
207
|
0.44
|
43
|
|
24,500
|
11,000
|
29,400
|
13,200
|
220
|
0.45
|
44
|
|
25,500
|
11,650
|
30,600
|
13,980
|
233
|
0.46
|
45
|
|
26,500
|
12,300
|
31,800
|
14,760
|
246
|
0.46
|
46
|
|
27,500
|
12,950
|
33,000
|
15,540
|
259
|
0.47
|
47
|
|
28,600
|
13,700
|
34,320
|
16,440
|
274
|
0.48
|
48
|
|
29,700
|
14,450
|
35,640
|
17,340
|
289
|
0.49
|
49
|
|
30,800
|
15,200
|
36,960
|
18,240
|
304
|
0.49
|
50
|
|
31,900
|
15,950
|
38,280
|
19,140
|
319
|
0.5
|
Levels 51-60
Level
|
Production
|
|
Efficiency
|
Time
|
Cost
|
Prod
|
/ h
|
/h
|
/ min
|
/
|
51
|
50m
|
33,000
|
16,700
|
39,600
|
20,040
|
334
|
0.51
|
52
|
|
34,100
|
17,450
|
40,920
|
20,940
|
349
|
0.51
|
53
|
|
35,200
|
18,200
|
42,240
|
21,840
|
364
|
0.52
|
54
|
|
36,300
|
18,950
|
43,560
|
22,740
|
379
|
0.52
|
55
|
|
37,500
|
19,800
|
45,000
|
23,760
|
396
|
0.53
|
56
|
|
38,700
|
20,650
|
46,440
|
24,780
|
413
|
0.53
|
57
|
|
39,900
|
21,500
|
47,880
|
25,800
|
430
|
0.54
|
58
|
|
41,100
|
22,350
|
49,320
|
26,820
|
447
|
0.54
|
59
|
|
41,200
|
23,800
|
49,440
|
28,560
|
476
|
0.58
|
60
|
|
44,400
|
24,600
|
53,280
|
29,520
|
492
|
0.55
|
Levels 61-70
Level
|
Production
|
|
Efficiency
|
Time
|
Cost
|
Prod
|
/ h
|
/h
|
/ min
|
/
|
61
|
50m
|
47,600
|
25,400
|
57,120
|
30,480
|
508
|
0.53
|
62
|
|
50,800
|
26,200
|
60,960
|
31,440
|
524
|
0.52
|
63
|
|
54,100
|
27,100
|
64,920
|
32,520
|
542
|
0.5
|
64
|
|
57,500
|
28,100
|
69,000
|
33,720
|
562
|
0.49
|
65
|
|
60,800
|
29,000
|
72,960
|
34,800
|
580
|
0.48
|
66
|
|
64,200
|
30,000
|
77,040
|
36,000
|
600
|
0.47
|
67
|
|
67,700
|
31,100
|
81,240
|
37,320
|
622
|
0.46
|
68
|
|
71,200
|
32,200
|
85,440
|
38,640
|
644
|
0.45
|
69
|
|
74,700
|
33,300
|
89,640
|
39,960
|
666
|
0.45
|
70
|
|
78,300
|
34,500
|
93,960
|
41,400
|
690
|
0.44
|
Levels 71-80
Level
|
Production
|
|
Efficiency
|
Time
|
Cost
|
Prod
|
/ h
|
/h
|
/ min
|
/
|
71
|
50m
|
81,900
|
35,700
|
98,280
|
42,840
|
714
|
0.44
|
72
|
|
85,500
|
36,900
|
102,600
|
44,280
|
738
|
0.43
|
73
|
|
89,200
|
38,200
|
107,040
|
45,840
|
764
|
0.43
|
74
|
|
92,900
|
39,500
|
111,480
|
47,400
|
790
|
0.43
|
75
|
|
96,600
|
40,800
|
115,920
|
48,960
|
816
|
0.42
|
76
|
|
100,400
|
42,200
|
120,480
|
50,640
|
844
|
0.42
|